Crown Place Birmingham
–

Student Accommodation

  • Project Name: CSL Birmingham
  • Location: Birmingham
  • Client: Crown Student Living
  • Architect: ECE Westworks
  • MEP Contractor: Highadmit Projects
  • Completion: December 2025

Project Overview

814 student bedrooms | 33-storey tower | Full MEP services | Part L energy performance

Highadmit Projects delivered the full mechanical & electrical building services for Crown Place, a major purpose-built student accommodation development in Birmingham City Centre, providing 814 student bedrooms across a landmark 33-storey tower & adjoining shoulder blocks.

The development comprises 572 studios, 114 cluster flats & 128 duplex rooms, together with more than 13,000 sq ft of student amenity space designed to provide a modern & connected living environment.

The extensive amenity provision includes communal kitchens, study rooms, dining areas, lounge spaces, a games lounge, cinema & gym, complemented by a 700 sq ft external terrace. The development also incorporates three blue roofs at different levels & a green roof at 33rd floor level.

Energy efficiency & regulatory performance were key considerations throughout the project, with the building services designed & installed to support the development’s Part L energy performance requirements. Efficient mechanical & electrical systems were integrated throughout the accommodation & communal areas to help minimise operational energy consumption while maintaining appropriate levels of occupant comfort.

The scale & height of the development presented significant technical coordination & logistical challenges, with building services required to be distributed throughout a 33-storey tower alongside the adjoining nine & 12-storey shoulder blocks. Highadmit worked closely with the main contractor, design team & wider supply chain to coordinate the MEP installation within a highly constrained city-centre site.

Crown Place was completed in December 2025 following a 153-week construction programme. The project subsequently received the “Most Considerate” accolade at the CCS National Site Awards 2026, recognising its performance in areas including innovation, sustainability & best practice.

The completed development provides high-quality student accommodation in the heart of Birmingham, combining extensive residential & amenity facilities with a fully coordinated MEP installation designed to meet the project’s energy performance & regulatory requirements.

Crown Place demonstrates Highadmit Projects’ capability in delivering complex, high-rise MEP installations at significant scale, combining detailed design coordination, energy efficiency & regulatory performance within challenging city-centre environments.

The Scope of Works Included:
  • Heating System
  • Air Conditioning
  • Mechanical Ventilation
  • Natural Ventilation
  • Domestic Hot and Cold Water Services
  • Building Management System
  • Thermal Insulation
  • Above Ground Drainage
  • Sanitaryware
  • External Services
  • Rainwater System
  • Lighting System
  • LV Distribution System
  • Rising Busbar
  • Fire Detection and Alarm System
  • Lightning Protection System
  • Intruder Alarm System
  • Disabled Refuge Alarm
  • CCTV Systems
  • Structured Cabling and Data System
  • Access Control Systems
  • Audio Visual Systems
  • Photovoltaic Systems
Start Typing
Privacy Preferences

When you visit our website, it may store information through your browser from specific services, usually in the form of cookies. Here you can change your Privacy preferences. It is worth noting that blocking some types of cookies may impact your experience on our website and the services we are able to offer.

Our website uses cookies, mainly from 3rd party services. Define your Privacy Preferences and/or agree to our use of cookies.