Crown Place Birmingham
–
Student Accommodation
- Project Name: CSL Birmingham
- Location: Birmingham
- Client: Crown Student Living
- Architect: ECE Westworks
- MEP Contractor: Highadmit Projects
- Completion: December 2025
Project Overview
814 student bedrooms | 33-storey tower | Full MEP services | Part L energy performance
Highadmit Projects delivered the full mechanical & electrical building services for Crown Place, a major purpose-built student accommodation development in Birmingham City Centre, providing 814 student bedrooms across a landmark 33-storey tower & adjoining shoulder blocks.
The development comprises 572 studios, 114 cluster flats & 128 duplex rooms, together with more than 13,000 sq ft of student amenity space designed to provide a modern & connected living environment.
The extensive amenity provision includes communal kitchens, study rooms, dining areas, lounge spaces, a games lounge, cinema & gym, complemented by a 700 sq ft external terrace. The development also incorporates three blue roofs at different levels & a green roof at 33rd floor level.




Energy efficiency & regulatory performance were key considerations throughout the project, with the building services designed & installed to support the development’s Part L energy performance requirements. Efficient mechanical & electrical systems were integrated throughout the accommodation & communal areas to help minimise operational energy consumption while maintaining appropriate levels of occupant comfort.
The scale & height of the development presented significant technical coordination & logistical challenges, with building services required to be distributed throughout a 33-storey tower alongside the adjoining nine & 12-storey shoulder blocks. Highadmit worked closely with the main contractor, design team & wider supply chain to coordinate the MEP installation within a highly constrained city-centre site.
Crown Place was completed in December 2025 following a 153-week construction programme. The project subsequently received the “Most Considerate” accolade at the CCS National Site Awards 2026, recognising its performance in areas including innovation, sustainability & best practice.
The completed development provides high-quality student accommodation in the heart of Birmingham, combining extensive residential & amenity facilities with a fully coordinated MEP installation designed to meet the project’s energy performance & regulatory requirements.
Crown Place demonstrates Highadmit Projects’ capability in delivering complex, high-rise MEP installations at significant scale, combining detailed design coordination, energy efficiency & regulatory performance within challenging city-centre environments.
The Scope of Works Included:
- Heating System
- Air Conditioning
- Mechanical Ventilation
- Natural Ventilation
- Domestic Hot and Cold Water Services
- Building Management System
- Thermal Insulation
- Above Ground Drainage
- Sanitaryware
- External Services
- Rainwater System
- Lighting System
- LV Distribution System
- Rising Busbar
- Fire Detection and Alarm System
- Lightning Protection System
- Intruder Alarm System
- Disabled Refuge Alarm
- CCTV Systems
- Structured Cabling and Data System
- Access Control Systems
- Audio Visual Systems
- Photovoltaic Systems