Silverthorne Lane
–
Student Accommodation
- Project Name: Silverthorne Lane
- Location: Bristol
- Client: Studio Hive
- Architect: ACA Studios
- Electrical Contractor: Highadmit Projects
- Completion: August 2026
Project Overview
706 student bedrooms | 16-storeys | 4 Interconnected Blocks | Full MEP services | NET Zero Carbon
Highadmit Projects delivered the complete electrical services installation throughout the development, providing the electrical infrastructure required to support the student accommodation, communal facilities & associated areas.
Our electrical scope included electrical distribution, lighting, small power, fire alarm, data & communications, access control & associated electrical infrastructure, providing a comprehensive installation across the residential & communal areas.
The scale of the development required extensive coordination across four blocks, with hundreds of individual bedrooms, communal facilities & extensive vertical service distribution being integrated within the architectural & structural design. Highadmit worked closely with the main contractor, design team & wider supply chain to coordinate the electrical installation & ensure the systems were efficiently delivered throughout the development.


Highadmit Projects delivered the electrical building services installation for the landmark Silverthorne Lane student accommodation development in Bristol, forming part of the wider regeneration of the Temple Quarter Enterprise Zone.
Sustainability was a key consideration throughout the development, with the project targeting Net Zero Carbon performance. Highadmit’s electrical installation supports the wider energy & environmental objectives of the development through the provision of efficient electrical infrastructure & systems designed to support long-term operational performance.
Silverthorne Lane represents a significant addition to Bristol’s student accommodation provision & forms an important component of the wider regeneration of the Temple Quarter area. The completed development combines high-density student accommodation with extensive amenity provision, supported by a fully coordinated electrical installation delivered by Highadmit Projects.
The project delivers 706 – Student bedrooms
- 4 Interconnected accommodation blocks
- 5-16 storeys – Building heights
- Net Zero Carbon – Sustainability objective
- Amenities – Gym, cinema, sports & games facilities, landscaped courtyard & communal spaces
The Scope of Works Included:
- Building Management System
- External Services
- Lighting System
- LV Distribution System
- Rising Busbar
- Fire Detection and Alarm System
- Lightning Protection System
- Intruder Alarm System
- Disabled Refuge Alarm
- CCTV Systems
- Structured Cabling and Data System
- Access Control Systems
- Audio Visual Systems
- Photovoltaic Systems